1.0 Megawatt Turbine Power Generator
Power - When you need it, where you need it
The CAI Spirit, a 1.0 Megawatt Turbine-based, Skid mounted, Power
Generation system, is a compact, lightweight, fully contained, turbine
generating system designed for maximum ease of integration into the various
physical and environmental requirements it is placed in. The
Power Turbine is capable of producing enough power to meet the demands of
1,000 average sized homes, industrial business parks and settlement villages
in the remotest parts of the world.
It is designed for use with traditional “spec fuels” such as
Natural Gas, Propane and Diesel as well as non-traditional fuels like Biogas
or Unprocessed Light Crude Oil. It
also provides an excellent heat recovery performance of a turbine, at a cost
that is competitive with conventional reciprocating engines generating
power.
Power is derived from a highly modified AVCO Lycoming T53 Gas
Turbine engine overhauled to CAI specifications. This engine was originally developed by the U.S. government
for its applications and, has more than 40 million hours of high historical
performance.
The fuel system and turbine has been designed such that it can be
field modified in less than 16 hours for use on any fuels presently
available or predicted to be available in the future.
This allows the CAI Spirit to maintain its competitive and economic
advantage for years, as the fuel situation changes in its environment and
new and more economical fuels become available.
Versatility of the CAI Spirit ranges from Commercial applications,
like in hotels and hospitals to Industrial applications like food processing
and chemical plants.
Benefits of the CAI 1.0 MW Gas Turbine Generator System are as
follows:
-
Versatility with choice of fuel options like Landfill Methane Gas (LFG),
Diesel Oil
-
Ability to connect to Heat Recovery Steam Generation (HRSG) Units
-
Alternative Fuels (propane, low BTU) capable
-
Modular design that is fully-contained with a low weight
-
Low NOx emissions and noise levels
-
Reduced capital cost
-
Reduced operation and maintenance requirements
-
Increased electric power generation over competing alternatives
-
Designed for continuous 24/7, 365 days duty operation
-
Fully automated system
-
Remote administration and control monitoring
-
Equipment upgradability
-
Available in 50Hz and 60Hz cycles
-